Ashburner Francis were responsible for the Site Wide Electrical Services on this major Defence project, providing input into the development of the Concept Design Report, undertaking full design of the HV electrical system reticulation and providing full service throughout the construction phase.
A total of 10 new substations were installed and several thousand metres of HV cable. The works were undertaken with minimum down time to the base.